It could make engineering easier if all water came at the same speed.

It isn’t.

The quality of water that is pumped into a residential system may vary through the day. Commercial and industrial facilities may have operating peak times. Stormwater conditions can change dramatically according to the weather. The demand for clean water also fluctuates according to the type of application.

So, designing a pump station isn’t simply an issue of identifying a flow number and selecting machines that are able to meet the requirements. Engineers must understand the conditions that the system will be exposed to.

Image credit: romtecutilities.com

Be aware of operating conditions Think in Operating Conditions, Not just Maximum Capacity

The flow that is the highest in importance however it’s just part of the process. Let’s say that a wastewater system is designed to accommodate a high volume of flow. Most of the time the flow coming in is less. During normal operating hours the station must be functioning properly.

It brings up issues like wet-well sizing, sizing the pump controls the head’s condition, how to adapt equipment when the demand for it changes.

A properly engineered package pumping system brings these considerations together around the actual requirements of the site instead of treating maximum pump capacity as the entire design objective.

The daily routine of wastewater

A sewerage lift station that serves business, homes or municipal infrastructure can experience changing influent conditions throughout its operating cycle.

The station’s management strategy will determine how the system manages the collection of wastewater and its pumps. The process involves structural dimensions pumps, valves, pumping gear and piping, as well as electrical components.

Other site-specific considerations may also influence the design. Romtec Utilities is able to integrate additional equipment like grinder vaults, or odor control equipment, depending on the specific application. It’s more economical to create the station around a specific project rather than using a generic configuration for every wastewater site.

Stormwater changes much more quickly

Stormwater has a completely different type of operating situation. The stormwater stations is usually quiet in dry weather conditions, but experience a large inflow of water when there is a significant weather storm. It could be part of a comprehensive flood-control plan or as a detention, treatment or drainage plan.

Romtec Utilities evaluates factors including flow rates that are required along with head conditions, size of the system as well as site requirements and environmental aspects when developing these systems.

A station used for commercial development may therefore look completely different from one that is designed to serve a municipal stormwater system.

The Head Conditions are Important along with flow

The problem of moving 1,000 gallons not the only problem for engineering. Engineers also have to determine where the water will go and what resistance to overcome by the pumping system.

Elevation changes, piping configuration the discharge conditions and many other characteristics of the system can affect the head conditions against which pumps function.

This relation between head and flow is another reason that choosing the right pump solely on its ratings isn’t enough. The pump’s technology and station’s configuration have to be adjusted to the hydraulic requirements throughout the application.

Plan for the Conditions that the Station will Experiece

Romtec Utilities creates customized pumping system for wastewater, stormwater and clean water systems. They also design systems for industrial, booster and other uses. The process includes preliminary design and budgeting, as well as plan sets along with system components, documentation, testing and startup.

The principle behind the design is simple pumps don’t spend their entire lives working in a set of favourable conditions.

They should also take into consideration the particular needs of the project’s hydraulic system, in addition to the fluctuating flow, demand, and requirements. It is vital to design a station that can cope with the challenges.

Scroll to Top